The water-supply in Tarcsa is of 35%, which means that 350 houses are bound to the system. There are no drainage and natural gas network.
Electricity is of 100%, it is bound in 1016 houses.
The telephone-network is of 12,5%, it means that there are 125 clients. The cable television is not introduced here.
Objectives:
- The execution of the plan about the drinking water-supply
- The realization of the drinking water-network
- The constant observation and supervision of the quality of drinking water and the water of the wells
- The conscious education of the population about the importance of the clean drinking water regarding also our health
- Official arrangements for the economical use of drinking water
- The systematic execution of drainage and water-purification inside the town and in the ambient settlements
- The exploitation of the modern possibilities of the ambient savage-purification
The total length of the village-road is 21 km , from which 3 km is blacktopped; this is only 3% of the whole network.
There is no railway station in the village; the closest one is in Érmihályfalva, at 7 km .
Quality | Total inside-road in km | Local administration | Total length of road in km | County-road in km | ||
r | e | i | e | |||
Blacktopped | 0,7 | 0 | 0 | 21 | 0 | 3 |
Cart-road | 9.3 | 9.3 | 8.7 | 0 | 0 | |
Totally | 10 | 9.3 | 8.7 | 0 | 3 |
Objectives:
- Working out some infrastructural projects
- Training of specialists among the employee of the Mayor's Office for the implementation and use of the projects
- Getting financial support for the spread of the phone-network
- The repair and the upkeep of the ditches and pavements
Priorities:
- Getting financial support for the expansion of the infrastructure